You usually look for gas inspection software for one reason: so that a deadline does not slip past you at a customer nobody remembered. A planning tool handles this, because it calculates the date of the next inspection from the last one and shows what is overdue. Issuing the inspection report itself, though, is a different task, and it is good to separate the two right at the start.
- Monitoring deadlines and writing the inspection report are two different tasks, not one.
- The date of the next inspection is calculated from the date of the last one, not from the order.
- The correct interval is set by the regulation and the contract; the software calculates from what you enter.
- A technician's qualification belongs with them as a data item, not in the planner's memory.
- Store the finished report on the order, not in a folder named by date.
Two tasks that get mixed into one
Companies looking for inspection software usually have two different things in mind, and from vendors they get an answer to only one of them.
The first task is to monitor and plan. Which customer's deadline is about to expire, which of the technicians holds the qualification, when they are free, and how to spread the inspections out so they do not all land in one month. This is planning work and a planning tool does it.
The second task is to issue the inspection report. A document with the prescribed particulars that will stand up to an audit. Planning software does not do this, and it is honest to say so before the company decides. Tools for producing reports are a separate category and tend to be tied to a specific type of regulated equipment.
The practical consequence is that many companies use two tools, and that should not be a reason for disappointment. The report is produced where it is produced, and is attached to the order as an attachment.
Monitoring deadlines is the core of it
A deadline spreadsheet fails predictably and always in the same way. It starts as a list of customers with the date of the last inspection and works as long as someone opens it once a month and goes through it.
The first gap appears when an inspection is carried out and nobody updates the date in the spreadsheet. From that moment the spreadsheet lies and nobody can tell, because it looks the same as before.
The second gap appears with customers added in the meantime. A new customer only gets into the deadline spreadsheet when someone remembers to do it, and they remember roughly half the time.
The solution is not a better spreadsheet, but recording the date of the last inspection where the job originates. In orders and history the record sits on the specific order along with attachments and notes, so the date is not created separately for the spreadsheet and separately for invoicing.
How to get deadlines into the plan
A procedure that can be done in a single afternoon:
- List the customers where you have a recurring obligation, and for each the date of the last inspection carried out.
- Note the interval for each one, as set by the regulation or the contract. Do not copy it from another customer; it differs by type of equipment.
- Work out the month in which the next one should take place. Not the day; the month is enough.
- Spread them across the year. If most of them fall in autumn, approach some earlier, while there is still time to arrange it.
- Approach customers one month in advance, not in the week the deadline ends.
- After the inspection, record the actual date on the order and let the next date be calculated from it.
Point five is the one that gets underestimated. A customer you approach in the last week has no time to adjust, and the company then goes out on a date that does not suit it. Advance notice is the way to spread the inspections out.
Point two is worth repeating: what the correct interval is, is determined by the regulation and the contract, not by the tool. The software calculates from what you enter, and it will monitor a wrongly entered interval just as reliably as a correct one.
A technician's qualification is a harder constraint than time
With gas inspections, a free technician is not necessarily a usable technician. The work is tied to professional competence, and the scope of the qualification differs between people in the company.
As long as one person does the planning, they know it from memory. As soon as several people plan, or planning is done in a hurry, memory is the weakest point of the process, and the mistake is only discovered on site.
In capacity and skills you can see who is free in the period, who has the required qualification and who is absent. You name the qualifications your own way, so the labels match how you talk about the scopes in the company.
The other half is the validity of the qualification itself. When a technician's expires, you remove the skill from them and they stop being offered in the plan. It is the only check that does not depend on whether someone remembers.
Where to put the finished inspection report
The most common way of storing it is a shared folder named by year and month. It works as long as you search by date. It stops working the moment a customer calls asking for the report on a specific unit for which they do not remember the date.
It is more usable to attach the report to the order it came from. It is then found together with what happened at the customer, and at the next inspection it is at hand even for a technician who was not there before.
| Where to store | Found by | Where it fails |
|---|---|---|
| Folder by date | Year and month | When searching by customer |
| E-mail inbox | Sender's name | When that person is no longer in the company |
| Attachment on the order | Customer and job | When the order was not created |
The last row has its condition: the job must be in the system as an order, even if it is invoiced as a flat fee or is part of a contract. An inspection done without a record looks the same as an inspection not carried out.
From how many people it makes sense
From three. Up to two people, one person keeps track of the deadlines and a spreadsheet is enough for them, because they both maintain it and use it themselves.
From three, technicians alternate at customers and the deadline stops being in one head. At the same time the combinations multiply: who is free, who holds the required scope of qualification and who was at that customer last time. It is precisely these combinations that cost time and cannot be held in memory.
Companies that mainly do inspections and periodic checks will feel it sooner than others, because recurring work makes up most of their operations. A plumbing & heating company, on the other hand, where inspections are a supplement to emergency service, will run into it later, but more unpleasantly: its deadlines slip away between emergencies.
What remains with the inspection technician
The expert assessment. The software shows whose deadline is ending and who holds the qualification for it, but it will not assess the condition of the equipment or write the report's conclusion.
Responsibility for the correctness of the interval remains too. The tool calculates from what you enter, so a wrongly determined interval carries into the plan without warning.
What goes away is monitoring in your head and in a spreadsheet that nobody updates. The date of the last inspection is created where the order is created, and the next date is calculated from it.
Frequently asked questions
Will gas inspection software write the inspection report for me?
Planning software will not. It handles deadlines, appointments, technician capacity and the records of completed jobs. Issuing an inspection report with the prescribed particulars is a different category of tool. You attach the finished report to the order as an attachment.
How is the date of the next inspection calculated?
From the date of the last one and according to the interval set by the regulation or the contract with the customer. The software calculates from what you enter, so the correctness of the interval remains the company's responsibility. Its job is to keep watch, not to determine what is correct.
How do you prevent a technician without the qualification from going to an inspection?
Keep the qualification on the technician as a skill and plan through a filter that does not offer the others. When the qualification expires, you remove the skill and the technician stops being offered. A check in the dispatcher's head does not catch this reliably.
Where should finished inspection reports be stored?
On the order they came from, not in a shared folder named by date. A report attached to the job is found together with what happened at the customer, and at the next inspection it is at hand even for a technician who was not there before.
From how many people does gas inspection software pay off?
From three. Up to two people, one person keeps track of the deadlines and a spreadsheet is enough for them. From three, technicians alternate at customers and the deadlines stop being in one head, so the monitoring has to be written down.
Customer equipment with inspection intervals. The overview shows what is due and what is overdue.
Plumbing, heating, gasEmergencies and planned installations. See who can be moved and with what impact.
Capacity and skillsWho is free, who has the required qualification and who is away. You get the answer while still on the phone.
Orders and historyAttachments, internal notes and a record of every change in one place on the order.
How to calculate the cost of a lost technician hour: what goes into it, how it yields the return on planning software and where the estimate tends to be inflated.
How often electrical equipment must be inspected in the Czech RepublicElectrical inspection intervals in the Czech Republic under Annex 4 of Government Regulation No. 190/2022 Coll., the shortest-interval rule and three exceptions.
What a work report should containWhat belongs in a work report, how it differs from a handover report and an inspection report, and how a technician fills it in directly at the customer's.
Plan more simply
ServisBook free for 30 days, no credit card.
Free trial →